Millwright resume examples

Choose and edit as your own

Get inspired by the best resume examples picked for your profession and create your!

Add pre-written phrases

Describe yourself as a professional just in 2 clicks! All the phrases you need are prepared by us

Save and Download your Resume

Save it in PDF format. Ready-to-sent to you employer!

This resume is created in 7 minutes.
Work History
Handyman Self employed - Las Vegas, NV 09/2018 - Current
Dishwasher Thai Street Cafe - Las Vegas, NV 01/2018 - 07/2018
Industrial Mechanic Millwright Aryzta - Ontario, CA 09/2017 - 11/2017
  • Served as first responder for all facility and equipment issues.
  • Submitted work orders to the manager on duty.
  • Worked closely with equipment maintenance engineers and technicians.
  • Cleared clogged drains and replaced defective parts such as valves, faucets and fixtures.
  • Completed light fabrication duties, including welding and pipefitting.
  • Monitored data center and life safety systems generators.
  • Logged detailed and thorough records of maintenance performed.
  • Repaired and replaced plumbing parts, including fixtures and drain lines.
  • Generated PM schedules and procedures.
  • Designed and constructed adaptations of component parts and standard parts
  • Made sure that products were produced on time and are of good quality.
  • Monitored product standards and quality-control programs.
  • Responsible for the selection and maintenance of equipment.

Mechanic II 220 Laboratories - Riverside, CA 01/2017 - 08/2017
  • Accurately read, understood, and carried out written instructions.
  • Maintained compliance with company standards to perform all maintenance activities.
  • Performed basic machine set up.
  • Employed wide variety of hand and power tools including hoists, drills, precision measuring instruments and electronic testing devices.
  • Followed company procedures to maintain work environment in a neat and orderly condition.
  • Read work orders to prepare for machine setup.
  • Installed, aligned, and balanced new equipment.
  • Met production goals by maintaining cost effective levels of spare parts inventory.
  • Performed routine preventive maintenance to ensure that building systems operated efficiently.
  • Inspected machine parts for conformance to product specifications.

Tile Setter Helper VARGAS TILE & STONE COMPANY - Los Angeles, CA 04/2016 - 11/2016
  • Accurately read, understood, and carried out written instructions.
  • Used hand tools to change worn cuttingtools.
  • Used precision measuring instruments, templates, and fixtures to measure dimensions of finished work pieces.


Facilities Maintenance Mechanic Sundance Spas Inc. - Chino, CA 10/1999 - 04/2002
  • Designed and constructed adaptations of component parts and standard parts.
  • Generated PM schedules and procedures.
  • Repaired and replaced plumbing parts, including fixtures and drain lines.
  • Logged detailed and thorough records of maintenance performed.

  • Repaired air compressors, chillers, heating units and exhaust fans.

Skills
  • Strong mechanical aptitude
  • Good communication skills
  • Fast learner
  • Bilingual Spanish/English
  • Strong initiative
  • Driving commercial vehicles
  • Industry safety equipment
  • Job shop experience
  • Hand/power tools
  • Basic computer skills




Education
High School Diploma: Metal shop, Welding shop, Auto shop and Wood shop. Garey high - Pomona, California 1995
This resume is created in 7 minutes.
Professional Summary
Seeking to build a long-term career in Construction Management, with an organization that enables me to learn as well as utilize my education, skills, and experiences, to ensure a successful future for all parties involved.
Skills
  • Interpret Blueprints
  • Creating Cohesion
  • Problem Solving
  • Planning/Organizing
  • Attention to Detail
  • Safety Oriented
  • Quick learner
  • Adaptable
Work History
Industrial Electrician, 09/2017 to 12/2017
Precision Industrial Contractors Inc Woodland, WA
  • Installed electrical conduit and wiring for power, controls and lighting
  • Installed, repaired and tested electronic systems for manufacturing equipment in accordance with the National Electric Code
  • Interpreted blueprints, schematics, drawings and layouts to complete Installation and repairs
  • Interpreted electric and electronic schematics and mechanical layouts to diagnose equipment problems
  • Installed control panels, transformers, motors and pumps
  • Assisted in the completion of a million dollar project that included the removal and replacement of a new 3400lb washer drum in a paper mill as well as removing and installing new bearings on other equipment in the plant, and installing a new pulp washing system
Residential Apprentice Electrician, 02/2017 to 06/2017
Powerhouse Electric Nampa, ID
  • Installed conduit, wiring, circuit breakers, media control panels, disconnects, switches, outlets, ac disconnects, door bells, wiring for garage openers, low volt transformers, lighting fixtures, ceiling fans, and appliances for Brighton and Corey Barton homes
  • Inspected electrical components, such as transformers and circuit breakers
  • Identify, troubleshoot and correct electrical problems with a variety of testing devices
  • Repair or replace wiring, equipment, or fixtures using hand tools and power tools
Commercial Electrician Apprentice, 12/2016 to 09/2017
Tradesmen Staffing Boise, ID
  • Interpreted drawings, wiring diagrams, blueprints and written descriptions of the project requirements.
  • Worked with various types of cable-ways, conduits and other electrical raceways.
  • Demonstrated expertise in the use of cable reels, stripping tools, voltage detectors, crimping tools and wire and cable cutters.
  • Installed luminaires and outlets
  • Identified, Installed, and Troubleshot low/High volt wiring for various circuits.
  • Installed low volt communication, security, and fiber optic cable for Microsoft data service farm
Concrete Laborer/Finisher, 10/2016 to 12/2016
Bearcat Builders LLC Meridian, ID
  • Installed and/or repaired decks, fences, and stamped concrete patios
  • Used equipment, hand held tools, and lasers to dig, grade, and compact earth
  • Utilized hand and power tools to build forms out of various materials
  • Used mags, floats, edgers, brushes, stamps and colored powder to finish concrete
  • Applied sealer with paint rollers and brushes
  • Calculated square footage of concrete needed to complete each project
  • Determined quantity of additives to be added according to cooling temperatures
Ironworker, Concrete laborer/finisher, Millwright, 05/2016 to 10/2016
Tradesmen Staffing Boise, ID
  • Established a cohesive relationship with coworkers to accomplish the goal of erecting structural steel buildings. One of which is the St. Alphonsus Hospital near Nampa, Idaho's Garrity Blvd
  • Utilized heavy equipment to transport and erect structural steel membranes with the communication of a spotter
  • Interpreted blueprints to weld structural steel supports in the correct location
  • Utilized fall protection to safely maneuver and spot weld roof decking
  • Utilized Heavy Equipment to demo, dig, grade, and compact earth  for the preparation of concrete construction
  • Interpreted drawings and blueprints to determine the location to erect forms for concrete walls, pads, and foundation pours
  • Assembled and installed manufacturing equipment
Sawyer, 11/2015 to 05/2016
Artistic Tile and Granite Meridian, ID
  • Would receive, sign for, unload, and label slabs of stone.
  • Organized, arranged, and memorized location of slab placement
  • Cohesively worked with owner and supervisor to complete projects 
  • Utilized forklift to maneuver slabs of stone.
  • Responsible for the service/maintenance and operation of the saw and forklift
  • When ahead of production goals, would help build templates, fabricate, and install finished counter-tops, sinks, and walls
Exteriors, 07/2015 to 10/2015
Fleetwood Homes Nampa, ID
  • Strived to overachieve every days goal of building at least 4 single or double wide manufactured homes
  • Assured studs and insulation were in place before hanging siding
  • Interpreted data sheet for each houses custom order requirments
  • Installed trim, fascia, windows, and window trim
  • Wrapped houses with weather protection
  • Helped in other areas such as roofing, framing, Sheetrock, and finish while awaiting next house to move down the line 
  • Kept tools and work area clean and maintained
  • Utilized various hand/air tools as well as table saws to complete each home
  • Created cohesion with coworkers to minimize fatigue and effectively work as a team to complete each house in a fast paced environment
  • Effectively used hand held radios to communicate with material handlers and line moving operators
  • Ensured a safe working environment through means of communication while lifting walkways when moving each house
Ironworker, 12/2014 to 07/2015
A+ Steel LLC Parma, ID
  • Cohesively worked as a team with coworkers and owner to erect pre fabricated R&M steel buildings.
  • Interpreted blueprints to successfully complete the erection of multiple buildings in accordance to building codes/prints
  • Utilized Reach Trucks to erect steel, transport material, and boom men up to work areas.
  • Utilized scissor lifts to aid in the erection and connection of structural steel, flanges, and clips.
  • Utilized hand/power tools to fasten, tighten, bolt, or screw structural steel, perlins, girders, sheeting, flanges, clips, and banding.
  • Completed tasks quickly while closely paying attention to safety.
  • Maintained, serviced, and charged lifts, tools, and heavy equipment
  • Kept work area clean and free of any hazards.
  • Inspected/utilized harnesses and equipment in accordance with OSHA's safety regulations
Recieving Operator, Maintenance tech, 07/2014 to 12/2014
Dickinson Frozen Foods Fruitland, ID
  • Responsible for operating production machinery to ensure onions/peppers are sorted by size into the correct storage bins for consistent feed into the warehouse without overflowing
  • Inspect/clean conveyors and rollers to ensure equipment runs smoothly with minimal complications.
  • Cleaned/sanitized bins to prevent rotting, contamination, and equipment clogging up with garbage.
  • Utilize Forklifts, Skid Steers, and Loaders to transport, product and waste
  • Operate or guide commercial vehicles for unloading and weighing out
  • Inspect, troubleshoot, and repair equipment during harvest
Education
GED: 2009
Treasure Valley Community College - Ontario, OR
Obtained Honors certificate which resulted in an award of two college courses with paid tuition
AAOT Associate of Arts Oregon Transfer: General Studies, 2012
Treasure Valley Community College - Ontario, OR
This resume is created in 7 minutes.
Summary
Seeking to build a long-term career with an organization, in a position that enables me to learn as well as utilize my education, skills, and experiences, to ensure a successful future for all parties involved.
Skills
  • Interpret Blueprints
  • Creating Cohesion
  • Problem Solving
  • Organized and detail oriented
  • Safety Oriented
  • Quick learner
  • Adaptable
  • Knowledge of (NFPA 70E) and (NEC) codes
Experience
Industrial Electrician Sep 2017 to Dec 2017
Precision Industrial Contractors Inc Woodland, WA
  • Installed electrical conduit and wiring for power, controls and lighting
  • Installed, repaired and tested electronic systems for manufacturing equipment in accordance with the National Electric Code
  • Interpreted blueprints, schematics, drawings and layouts to complete Installation/repairs
  • Interpreted electric and electronic schematics and mechanical layouts to diagnose equipment problems
  • Installed control panels, transformers, motors and pumps
  • Assisted in the completion of a million dollar project that included the removal and replacement of a new 3400lb washer drum in a paper mill, as well as removing and installing new bearings on other equipment in the plant, and installing a new pulp washing system
Residential Electrial Apprentice Feb 2017 to Jun 2017
Power House Electric Nampa, ID
  • Installed conduit, wiring, circuit breakers, media control panels, disconnects, switches, outlets, ac disconnects, door bells, wiring for garage openers, low volt transformers, lighting fixtures, ceiling fans, and appliances for Brighton and Corey Barton homes
  • Inspected electrical components, such as transformers and circuit breakers
  • Identify, troubleshoot and correct electrical problems with a variety of testing devices
  • Repair or replace wiring, equipment, or fixtures using hand tools and power tools
Commercial Electrical Apprentice Dec 2016 to Sep 2017
Tradesmen Staffing Boise, ID
  • Interpreted drawings, wiring diagrams, blueprints and written descriptions of the project requirements
  • Worked with various types of cable-ways, conduits and other electrical raceways
  • Demonstrated expertise in the use of cable reels, stripping tools, voltage detectors, crimping tools and wire and cable cutters
  • Installed luminaires and outlets
  • Identified, Installed, and troubleshot low/High volt wiring for various circuits
  • Installed low volt communication, security, and fiber optic cable for Microsoft Data Service Farm
Ironworker, Conrete Finisher, Millwright May 2016 to Oct 2016
Tradesmen Staffing Boise, ID
  • Established a cohesive relationship with coworkers to accomplish the goal of erecting structural steel buildings. One of which is the St. Alphonsus Hospital near Nampa, Idaho's Garrity Blvd
  • Utilized heavy equipment to transport and erect structural steel membranes with the communication of a spotter
  • Interpreted blueprints to weld structural steel supports in the correct location
  • Utilized fall protection to safely maneuver and spot weld roof decking
  • Utilized Heavy Equipment to demo, dig, grade, and compact earth  for the preparation of concrete construction
  • Interpreted drawings and blueprints to determine the location to erect forms for concrete walls, pads, and foundation pours
  • Assembled and installed manufacturing equipment
Sawyer Nov 2015 to May 2016
Artistic Tile and Granite Meridian, ID
  • Received, signed for, unloaded, and labeled slabs of stone.
  • Organized, arranged, and memorized location of slab placement
  • Cohesively worked with owner and supervisor to complete projects 
  • Utilized forklift to maneuver slabs of stone
  • Responsible for the service/maintenance and operation of the saw and forklift
  • When ahead of production goals I would help build templates, fabricate, and install finished counter-tops, sinks, and walls
Exteriors Jul 2015 to Oct 2015
Fleetwood Homes Nampa, ID
  • Strived to overachieve every days goal of building at least 4 single or double wide manufactured homes
  • Assured studs and insulation were in place before hanging siding
  • Interpreted data sheet for each houses custom order requirements
  • Installed trim, fascia, windows, and window trim
  • Wrapped houses with weather protection
  • Helped in other areas such as roofing, framing, Sheetrock, and finish while awaiting next house to move down the line 
  • Kept tools and work area clean and maintained
  • Utilized various hand/air tools as well as table saws to complete each home
  • Created cohesion with coworkers to minimize fatigue and effectively work as a team to complete each house in a fast paced environment
  • Effectively used hand held radios to communicate with material handlers and line moving operators
  • Ensured a safe working environment through means of communication while lifting walkways when moving each house
Ironworker Dec 2014 to Jul 2015
A+ Steel LLC Parma, ID
  • Cohesively worked as a team with coworkers and owner to erect pre-fabricated R&M steel buildings
  • Interpreted blueprints to successfully complete the erection of multiple buildings in accordance with building codes/prints
  • Utilized Reach Trucks to erect steel, transport material, and boom men up to work areas.
  • Utilized scissor lifts to aid in the erection and connection of structural steel, flanges, and clips.
  • Utilized hand/power tools to fasten, tighten, bolt, or screw structural steel, purlins, girders, sheeting, flanges, clips, and banding
  • Completed tasks quickly while closely paying attention to safety
  • Maintained, serviced, and charged lifts, tools, and heavy equipment
  • Kept work area clean and free of any hazards
  • Inspected/utilized harnesses and equipment in accordance with OSHA's safety regulations
Recieving Operator/ Maintenance Tech Jul 2014 to Dec 2014
Dickinson Frozen Foods Fruitland, ID
  • Responsible for operating production machinery to ensure onions/peppers where sorted by size into the correct storage bins for consistent feed into the warehouse without overflowing
  • Inspect/clean conveyors and rollers to ensure equipment runs smoothly with minimal complications
  • Sanitized bins to prevent rotting, contamination, and equipment clogging up with garbage
  • Utilize Forklifts, Skid Steers, and Loaders to transport, product and waste
  • Operate or guide commercial vehicles for unloading and weighing out
  • Inspect, troubleshoot, and repair equipment during harvest
Education and Training
GED 2009 Treasure Valley Community College Ontario, OR, US Obtained Honors certificate which resulted in an award of two college courses with paid tuition
(AAOT) Associate Of Arts Transfer , General Studies 2012 Treasure Valley Community College Ontario, OR, United States
This resume is created in 7 minutes.
Experience
10/2012 to Current
PROJECT MANAGER CHIPPEWA RESOURCES MINOT, ND
  • Installation of 3 in, 6 in, 8 in, 10 in and 12 in water transfer lines.
  • Installation of water transfer buildings.
  • Oversee construction of water depot.
  • Oversee construction of building salt water disposals.
  • Construction of Gas lift.
  • Treater clean-outs and PM's.
  • Managed one-calls, all communication with survey companies.
  • Line out bore rigs.
  • Managed Hydro-Vac trucks and scheduling.
  • Customer relations including communication with land-owners.
  • Ordering of all parts and piping to complete job.
  • Met monthly quota's and job completion.

Inspection for Lee County, Iowa on the Dakota Access Pipeline

  • Osha 40 hour certificate
  • Flexpipe certification

04/2008 to 04/2012
MANAGER B&G ROUSTABOUT, INC WILLISTON, ND
  • Manage Hydro-Vac truck and employees.
  • Customer relations, shipping and receiving, invoicing, read blue prints, manage pipe-yard, D.O.T.
  • experience such as gaining permits, purchasing agent, set up drug testing for employees, entering timesheets.
  • Unload/load pipe, inventory, pipe-pigging, bolt up torque work, flange make-up, fencing, running forklift and petti-bone, welder's helper, keeping track of pipe footage and bores.
05/1999 to 04/2008
OWNER | CALDWELL & COMPANY, LLC HASTINGS, MI
  • Daily opening and closing of business, meeting of monthly quota's and job completion, daily interaction with Homeowners and/or builders regarding progress updates and complaints, inspection of jobs performed by crews, oversight of work crews, drafting of proposals for homeowners and insurance companies, invoicing and billing, interactions with materials suppliers.
  • Load/unload materials, verification of materials, tools and information related to individual job, assist in cleanliness of homeowner's property, management of home roof repairs, measurement of potential job sites, new-construction, re-roofing and roof repair for flat and pitch roofs.
  • Professional representation of company.
05/1995 to 05/1999
Roofing Foreman MCKEOUGH BROS., INC HASTINGS, MI
  • Load unload materials, tools, and information related to individual jobs, assist in cleanliness of homeowner's property.
  • Management of home roof repairs, and inspection of jobs performed by crews, daily interactions with homeowners and/or builders regarding progress, oversight of crews, interaction with materials suppliers.
  • Professional representation of employer.
07/1992 to 04/1995
Millwright D&S Machine Repair Hastings, MI
  • Assembly of presses.
04/1987 to 05/1992
E.W. Bliss Company
  • Millwright-assembly of presses.
09/1984 to 07/1986
Blunt, LTD Hastings, MI
  • Spraypainter-cleaning and spray painting of constructural steel.
Current

Education and Training
1984
Graduate Thornapple-Kellogg High School Middleville, MI
This resume is created in 7 minutes.
Professional Summary

Knowledgeable Millwright Apprentice  who understands installation and repair processes, how they are carried out and methods to increase efficiency.

Looking for opportunities that offer training and growth in maintenance, repair and processes. Excels at building effective teams that succeed in any work environment.

Reliable worker with strong mechanical aptitude and a willingness to learn.

Skills and Certificates
  • Extensive experience with hand tools and rigging
  • Strong mechanical aptitude
  • Works well in extreme temperatures
  • Metal manipulation/ Welding



  • WHMIS
  • CPR certified. Occupational First Aid
  • Fall Restraint Ticket
  • Confined Space Ticket
  • Valid Class 5 BC Driver's License
  • Experience in operating ATVs, snowmobiles
Work History
Millwright Apprentice 07/2016 to Current
Twin Valley Contracting Kamloops, BC
  • Change out of worn out, broken or dysfunctional parts, fabrication for install of conveyors,  installation of new systems, preventative maintenance on machinery.
  • Maintenance and repair of equipment and machines.
  • Frequently diagnosed mechanical problems and determine how to correct them.
  • Operation of heavy machinery.
Laborer 06/2015 to 06/2016
JV Driver Energy Leduc, AB
  • Industrial construction including concrete work, fence maintenance and equipment operation
  • Given tasks with no supervision
  • Organizing heavy materials including delivery
Laborer 02/2013 to 03/2015
Arctic Spas Kamloops, BC
  • Shipping and receiving
  • Installation of hot tubs including re-plumbing or repairing broken pipes, basic electrical repairs and pump repairs
  • Unsupervised service calls.


Security Personnel 02/2010 to 06/2015
Duchess On Tranquille Kamloops, BC
  • Checking ID
  • Keeping patrons calm during any uprising, escorting troublesome or intoxicated patrons from the premises, patrolling parking lot, writing detailed reports on any incidents that occurred
  • Worked with RCMP in hostile situations, ensuring everyone leaves safely.
Laborer 02/2008 to 02/2011
ArborScapes Tree Service Kamloops, BC
  • General labor
  • Loading trailers with logs, tree maintenance, machine maintenance, chainsaw work
  • Building landscape walls, laying stone pathways and laying irrigation.
Education
High School Diploma: 2008 Prince George Secondary School - Prince George BC
This resume is created in 7 minutes.
Summary
To utilize my many years of fabrication, and machine building to secure employment.
Skills
  • Interpretation of blueprints, wiring diagrams and drawings
  • Expertise in frame prep
  • Machining familiarity
  • Drilling and tapping skills
  • Crane and hoist equipment operation
  • Accuracy
  • HDPE pipes and fittings expertise
  • Welding tool operation
Experience
05/2014 to 08/2015
  • machine fitter / indelec automation, vaughan.
01/2014 to 09/2016
Machine Builder MACHINE builder/ M&R Automation, vaughan

  • Interpreted prints, drawings and sketches.
    Set up and performed hand and automatic assembly operations on components, sub-assemblies and assemblies.
    Assembled components with hand and power tools.
    Cleaned and finished sub-assemblies or assemblies using hand or power tools.
    MILLWRIGHT/ gMB iNSTALLATIONS, bRAMPTON.
06/2012 to 09/2013
  • Millwright / Winters technical staffing, ats reliance, toronto.
01/2007 to 05/2012
Machine fitter
  • Various contracts throughout GTA.
  • Automotive, Food, Pharmaceutical Industries.
  • Machine building, maintenance, conveyors / Synchronized automation systems, concord.
08/2006 to 01/2007
08/2004 to 03/2006
  • machine builder/ pack smart, toronto.
  • 6 month contract to assemble high speed packaging equip.
06/1995 to 03/2004
welder/fitter/ millwright / martec technologies
Education and Training
June 2003
Durham College
1993
George Brown College Toronto Tech fusion welding and recasting / may 1992- aug.
may 1992
Toronto welder/fitter certification / sept. Excel Technical Trade School
George Brown College Toronto
Certifications
Certified by MCCR & CWB Welding. 433a Red Seal Industrial Mechanic. Lift Truck operator cert. CSA cert. Basics of Fall Protection & Working on elevated platforms. WHMIS for workers
Skills
packaging, welder, Welding
This resume is created in 7 minutes.
Summary


Level 2 Millwright Apprentice with 6+ years of hands-on experience in the LNG industry; ability to work independently and with a team to accomplish various daily and/or time sensitive tasks, while maintaining minimal downtime, and making safety a top priority.  

Skills
  • Strong work ethic
  • Multi-tasker
  • Detailed oriented
  • Fast Learner
  • Strong mechanical aptitude
  • Manual dexterity
  • Methodical
  • Troubleshooting skills
  • Theoretical and practical mathematics
  • Managing large teams
  • Computer systems (Mircosoft: Excel, Power point, Word, JDE)
  • Good physical condition and health
  • Man lift operation (Boom & Scissor)
  • Forklift operation
  • Safe handling of Nitrogen, LN2, and LNG (BC Safety Authority)
  • Welding/Cutting (MIG/TIG, Stick, Oxy-acetylene)
  • Steel fabrication
  • Plasma Cutter
  • Engine Instrumentation and Test Systems (AVL) 
  • Over head cranes
  • Hilti gun
  • Pneumatic tools
  • Power tools
  • Hand tools
  • Measuring tools (calipers, micrometers, gages, tapes)
  • Stationary equipment (Drill presses, lathe, milling machine, metal band saws, bench grinders, pipe threading machine, pan brake, hydraulic shears)​
Experience
Millwright Apprentice 03/2015 to Current Westport Fuel Systems Vancouver, B.C.
 
Responsibilities
 
  • Assist master Millwright and other trades such as Pipefitter, Plumber, and Electrician with various mechanical tasks: compressor and HPU maintenance, AHU and cooling tower maintenance, electric motor maintenance, product test rig construction and install,  additional upgrades to test rigs and equipment, installing hard and flex line plumbing around the facilities, custom steel fabrication and welding, removal and install of fuel storage tanks.
  •  Daily and scheduled PM equipment checks to assure facility operations run without any critical downtime.
  • Assist in LNG tanker delivery for tank station refill.
  • Maintaining Emergency Spill Kits located around the facilities
  • Coordination of environmentally hazardous waste product disposal
  • Member of the Emergency Response Team
  • Assist engineers with project product testing
  • Delivery of sorted scrap metal to recyclers
  • Standard routine maintenance of fleet vehicles and forklifts
 
 
Production Leader 11/2010 to 09/2014 Westport Fuel Systems Delta, B.C.


Responsibilities

  • Fill various positions on the production line to maintain uninterrupted flow of product assembly.
  • Maintain consistent flow of parts supply on the production line.
  • Labor planning and allocation.
  • Management and production team update on production schedule, daily/weekly progress reports against delivery targets.
  • 5S implemented and enforced (audited weekly).
  • Ordering 5S materials from suppliers.
  • Cell Metrics and PM records maintained.

Results & Achievements

 
  • 5S implemented to all areas of the production line which made an effective and efficient impact to production flow. 5S audit completed weekly by operators and production leader, with the results entered onto an Excel spread sheet, designed to show the team the overall score for their work station.
 
Shipper 06/2008 to 02/2010 Daltile Corp. Vancouver, B.C.
Warehouse Assistant Manager 05/2006 to 10/2007 Torlys Inc. Delta, B.C.
Education and Training
Millwright Apprentice BCIT Burnaby, B.C., Canada
  • Millwright Apprentice  Lvl. 2 ​ (Sept. - Oct. 2016)
  • Millwright Foundation (Sept. 2014 - Feb. 2015)
Business Management BCIT Burnaby, B.C., Canada
  • Business Law (Jan. - April. 2013)
  • Accounting for the Manager (Sept. - Oct. 2012)
  • Principles of Management (April. - July 2012)
  • Business Information Systems (Jan. - April. 2012)
Essential Management Skill 2012 Sauder School of Business (UBC) Vancouver, B.C., Canada
Road Building Foundation 2010 Douglas College Surrey, B.C., Canada
This resume is created in 7 minutes.
Professional Summary
Highly skilled Machinist with an exceptional ability to produce and repair mechanical equipment with precision and strong attention to detail.
Skills
  • Material handling expert
  • Assembly line production
  • Production procedures
  • Exceptional organizational skills
  • Interpersonal skills
  • Extremely quick learner
  • Numerical controls understanding
Work History
Millwright, 07/2012 to Current
Enviva Biomass North Hampton, NC
  • Align chain and sockets
  • Track belts
  • Trouble shooting
  • Welding
  • Rebuild pumps
  • Trouble shoot Hydraulics
  • Rebuild Air Cylinders
Millwright, 03/2003 to 07/2012
Georgia Pacific Jarratt, VA
  • Align chain and sockets
  • Track Belts
  • Trouble Shooting
  • Welding
  • Rebuilding Pumps
  • Trouble Shoot Hydraulics
  • Rebuild Air Pumps
Millwright, 07/2012 to Current
Enviva Biomass North Hampton, NC
  • Align Chain Sockets
  • Trouble Shooting
  • Work on Mobile  Equipment
  • Work on 33 Ton Crane
  • Track Belts
  • Rebuild Equipment
Education
GED: 2012
Greensville County High School - Emporia, VA
This resume is created in 7 minutes.
Professional Summary
Construction Manager who provides clear direction and explains plans and contract terms in a clear and understandable way. Safety-conscious and detail-oriented.
Skills
  • OSHA Certified
  • Certified Welder
  • Excellent customer relations
  • Knowledgeable in construction safety

  • Subcontractor management
  • Building systems and services
  • Fall Protection Plan (FPP)
  • Scaffolding
Work History
Shift Supervisor October 2004 to May 2014
Seabrook Nuclear Power Station - Seabrook, NH
Monitor employees' work level
Preform job hazard and safety analysis
Maintain job records and schedule work crews
Monitor tool and part inventories and the condition and maintenance of shops to ensure adequate working conditions
Maintain strict adherence to OSHA and nuclear safety procedures
develop ,implement or evaluate maintenance policies and procedures
design equipment configurations to meet personnel needs
Erect forms, framework, scaffolds,hoists, roof supports, or chutes in commercial constitution
Government security clearance
Intensive security training.
Nine years of intensive safety training in nuclear power industry
OSHA 30 Certified
Passed continuos random drug and alcohol fitness for duty test
Millwright Supervisor Schiller Station Power Plant - Newington, NH
Monitor employees' work levels
Develop,implement or evaluate maintenance and procedures
Insert shims, adjust tension on nuts and bolts, or position parts using hand tools and measuring instruments to set specified clearance between moving and stationary parts
Align machines and equipment , using hoists, jacks,hand tools,squares, rules micrometers.
Layout mounting holes, using measuring instruments.
Signal crane operator to lower basic assembly units and align
Examine objects, or facilities and analyze information to determine needed installations, services or repairs
Conduct or arrange for worker training in safety,repair,or maintenance techniques, operational procedures,or equipment use.
Well versed in all phases of welding 
Hold an American Welding Society 1 inch unlimited welding certification.
Education
South Shore Regional Technical High School 1981 Hanover, MA
High School Diploma:
Certifications
Surveying /Project layout
Certified rigger and signaler
millwright 16 hour safety
OSHA 10 Construction
OSHA 30 Construction
Construction fall protection
Scaffold Erector Qualification
Scaffold User Qualification
Powered Industrial Truck Operator - Rough Terrain
First Aid CPR/AUD
Aerial Lift Operator
GE Gas Turbine
Hytorc Bolting Tech Qualification
This resume is created in 7 minutes.
Professional Summary
Friendly Customer Service Agent skilled in communicating with people of diverse cultures while providing exceptional customer service. Natural leader with a passion for team building and promoting positive company morale. Decisive action that produces top quality work with excellent attention to detail. Exceptional interpersonal skills enable to move quickly and accuratey. Extensive knowledge in the mechanic field ranging from performance on several types of aircrafts. Also have great training techniques and superb commitment to customers.
Skills
  • Sheet Metal Fabrication and Layout
  • Man lift, Scissor lift, Platform, and Forklift operator
  • Fasteners/Hardware Parts Inventory Handler​
  • Quality/Safety Assurance FAA staff experience
  • Industrial equipment operation experience
  • Multitasking skills
  • Able to learn quickly
  • Worked with Majority Boeing Aircrafts both Military and Commercial
  • Boeing C-17,707, 727, 737, 747, 757, 777, KC135, MD11, DC10
  • Lockheed Martin C5
  • Airbus A23
  • Safety management
  • Follows procedures
  • Able to lift up to 75 lbs
Work History
Millwright Assistant 03/2012 to 12/2014
Alltek San Antonio, TX

     

  • Fabricated large and small parts per drawing and assembled parts as required.
Interior Mechanic 03/2007 to 08/2007
San Antiono Aerospace (PDS Contractor) San Antonio, TX
Interior Mechanic 01/2006 to 10/2006
Boeing Aerospace (PDS Contractor) San Antonio, TX
Structure Mechanic 01/2005 to 07/2005
Timco Arizona (STS Contractor) Goodyear, AZ
Structural Mechanic 08/2004 to 12/2004
Boeing Aerospace Support Center (Storm Contractor) Kelly Usa, TX
Structural/Interior Mechanic 03/2004 to 08/2004
Structual/Interior Mechanic (Aero Sky Contractor) San Antonio, TX
Service Maintnece 05/2003 to 08/2003
Timco (Strom Contractor) Goodyear, AZ

 

Structural/Interior Mechanic 07/2002 to 12/2002
Structural/Interior Mechanic (Aero Sky Contractor) San Antonio, TX
Structural Mechanic 04/2001 to 10/2001
Boeing Aerospace Support Center (Aviant Contractor) Kelly Usa, TX
Structural/Interior Mechanic 03/2000 to 04/2001
Raytheon (Strom Contractor) Waco, TX
Heavy Structor Mechanic 04/1999 to 03/2000
Boeing Aerospace Support Center Kelly Usa, TX
Structural/Interior Mechanic 02/1998 to 04/1999
Northrop-Grumman (Lockheed Martin Contractor) Lake Charles, LA
Structural Mechanic 12/1996 to 02/1998
Lockheed Martin (Contractor) Kelly Usa, TX
Sheet Metal Fabricator 11/1992 to 10/1996
Fairchild Aircraft San Antonio, TX
Education
High School Diploma: 1986 McCollum High School - 500 W Formosa San Antonio, Tx
This resume is created in 7 minutes.
Summary

I'm a Qualified Millwright/Mechanical Superintendent with 22 years experience.I've got experience and excellent skills in the technical-,mechanical-,construction-,human resources field and Qualified Quality/ Mechanical Inspector. I'm committed to my employee and employers. I posses the ability to take leadership in a team environment. I'm computer literate in word processing,spreadsheets and data applications. The safety of the workers is priority for me and also zero accidents.

Qualifications
  • Superintendent
  • Qualified trade test/diploma
  • Offshore survival
  • Qualified mechanical inspector
  • Mobile crane course
  • APC course HSE
  • SIPP course HSE
  • Technical supervisor
  • Production skills
  • Powerpoint
  • Quality control
  • Operator
  • Department administration
  • Workshop practices
  • Production
  • Safety and first aid
  • IIF course(incident injury free)
  • Computer Proficient
  • Spreadsheets/excel/Microsoft
Professional Experience
MECHANICAL INSPECTOR 03/2015 CB&I WHEATSTONE, AUSTRALIA
  • Installation of Mechanical Equipment
  • Structural Static Equipment and civil works
  • Responsible for Quality Control Activities
  • Assist on civil inspections i.e.pre post,pours of concrete bases and grouting
  • Carry out inspections to ensure that contract specifications are met when equipment and structures installed
  • Input into preservation of supplied equipment prior to installation
  • Point of contact with client to ensuring that all hold/witness points are adhered
  • Ensuring that all quality records are generated evaluated and signed off prior to mechanical completion
  • assist with coordination of completion and commissioning when required as well as static equipment,structural and grouting
MECHANICAL SUPERINTENDENT 04/2012 to 04/2014 CB&I(PNG) HIGHLANDS, PAPUA NEW GUINEA
  • Led [LNG project] that ran [24] months.
  • Installation of rotating equipment,pre-alignments,grouting of all equipment,final alignments as per specifications and commissioning.
  • Mechanical QA/QC inspector
  • Pipe cutting and refacing of flanges by using tri-tools
  • Installation of static equipment and installation of all internals inside static equipments
  • Manufacture of plinths and catch basins and manholes (civil works)
  • Preservation on rotating and static equipment
  • Statistic keeping on all equipment related to QC work.
MILLWRIGHT SUPERINTENDENT 01/2007 to 01/2012 CB&I MALONGO BASE, CABINDA
  • Led [ GAS PLANT project] that ran [5] YEARS.
  • Installation of pump,motors,blowers,compressors and fin fan
  • Coolers,turbine and complete final alignments as per specifications
  • Commissioning and start-up of plant
  • Fault finding on rotating equipment Fabrication of platforms solar turbines
  • Done all QC Inspections.
SUPERINTENDENT 06/2006 to 12/2006 CB&I JAMAICA, AMERICA
  • Alumina plant
  • Erection and installation cyclones according to drawings
  • Installation of pumps,blowers and alignments as specification.
  • Commissioning
SUPERINTENDENT 04/2006 to 05/2006 CR INDIA, ASIA
  • Refinery
  • Breachlocks shutdown repairs.
MILLWRIGHT SUPERINTENDENT 07/2005 to 01/2006 CB&I THAILAND
  • Installation of fin-fans
  • Alignments
  • Commissioning.
MECHANICAL SUPERVISOR 05/2004 to 05/2005 CB&I BONNY ISLAND, NIGERIA
  • Installation of pump and motors
  • Alignments of couplings om pumps and motors
  • Installation of static and rotating equipment
  • Specialized on tri-tools
  • Flange facing M/C
  • Refacing of flanges on site
  • Commissioning of LNG plant.
MILLWRIGTH SUPERVISOR 07/2003 to 03/2004 CB&I JAMAICA, AMERICA
  • Alumina plant
  • Installation and Alignments of pumps,gearboxes and motors
  • Assembling, installation and commissioning of conveyors/filters/blowers and various pumps.
SUPERINTENDENT/BUYER 07/2000 to 06/2003 PROFAB SALDANHA, SOUTH AFRICA
  • Construction of sulpher plant
  • Filtration of plant and mechanical works
  • Supervising of lock out systems on commissioning
  • Planning and purchases for all construction projects
  • Researching and buying
  • Payments and balancing all creditors accounts
  • Chair of planning-,construction and staff meetings.
MECHANICAL SUPERVISOR 11/1999 to 06/2000 CB&I ARUBA, AMERICA
  • Construction of ship loaders
  • Specialized installation of various components
  • Alignment of gearboxes
  • Alignments of pulleys and conveyors Lazers on drives
  • Commissioning of new plant
  • Managing a crew of 60 workers.
FOREMAN 01/1999 to 11/1999 PROFAB SALDANHA, SOUTH AFRICA
  • Specializing in building,installation and maintenance of various pumps
  • Cooling towers and clarifiers
  • Maintaining and commissioning of water treatment plants
  • Working also as boilermaker
  • Managing of workers.
MECHANICAL FOREMAN 09/1997 to 12/1998 CB&I SALDANHA, SOUTH AFRICA
  • Construction
  • Managing of workers
  • Structural construction of various components commissioning on conveyors, valves and dryers
  • Mechanical work on all components of conveyors,valves and dryers.
OWNER 04/1996 to 09/1997 BUSINESS OWNER HEIDELBERG, SOUTH AFRICA
  • Managing business and staff
  • Purchasing of stock
  • Accounting
  • Tax returns
  • Sales
  • All the advertising and PRO work.
PRODUCTION TECHNICIAN 09/1989 to 04/1997 AMERICAN TABACCO HEIDELBERG, SOUTH AFRICA
  • Installation and maintenance of high speed machines
  • Faultfinding and mechanical maintenance
  • Supervisor for workers.
FIELD TECHNICIAN 06/1982 to 04/1988 COMP AIR ALBERTON, SOUTH AFRICA
  • Rebuilding and construction of compressors
  • Installation and commissioning of compressors
  • Faultfinding.
FITTER 06/1982 to 04/1988 ISCOR VANDERBIJLPARK , SOUTH AFRICA
  • Faultfinding and repairs on hydraulics and pneumatics
  • Maintenance on conveyor belts
  • Maintenance and overhauls of pumps
  • rebuilding and commissioning of compressors.
Education
DIPLOMA: MECHANICAL INSPECTOR 2009 ASQ PRETORIA, SOUTH AFRICA, GAUTENG

Mechanical Inspector I & II

DIPLOMA: MECAHNICAL 1985 UNIVERSITY OF TECHNOLOGY VEREENIGING, SOUTH AFRICA, GAUTENG
Accomplishments
  • Customer Relations
  • Earned highest marks for customer satisfaction, company-wide.

  • Workflow Planning
  • Implemented new work process flow which increased department productivity.

  • Process Improvement
  • Created new departmental procedures manual.
  • Assessed organizational training needs.

  • Management
  • Competitive Analysis
  • Performed competitive analysis to make recommendations for future company growth.
Skills

Excellent skills in the technical,mechanical,construction and inspection field.